Press kit

Regenerative Infrastructure Holdings

AI data centres, renewable energy infrastructureDenver, Denver metro, Colorado, US

www.regenerativeinfrastructureholdings.com

efficiency won't get a data centre past the town hall. a 20-year humanitarian says the missing line in the plan is who gets paid first

Opponents blocked or delayed $198bn of US data-centre projects (Data Center Watch, H1 2026). Towns are refusing two things, says Katie Hilborn, after 15 years in Nepal: what the building takes and who keeps what it earns. Green answers half. Her 10 October definition of a regenerative AI data centre builds for both: the building (closed-loop cooling, reused heat) and the deal (a Community Trust paid before profits). Site one: planned 100 MW Nepal campus.

Katie Hilborn has published a working definition of a regenerative AI data centre, and it starts from what towns are actually refusing. The objections in this year's planning fights come in two kinds: what the building takes, in power, water and noise, and who keeps what it earns. A green data centre answers part of the first. "A green data center minimizes its environmental impact; a regenerative AI data center strengthens the place it lives inside," Hilborn writes in the definition, published on 10 October 2026. Her test is one question: is the place stronger because the facility is here? The definition has two layers, and a facility is regenerative only when both are in place. The first is the building: renewable power aligned to the site, closed-loop non-evaporative cooling that keeps ongoing water use near zero, waste heat reused for greenhouses or local enterprise instead of vented, and noise and EMF mitigation for the people around it. The second is the system around the building: a Community Trust, a locally governed trust paid a share of the facility's revenue before profits are distributed; a Community Investment Pool through which local people can invest at any amount; and a seat for the host community in governance (company model, per RIH's published FAQ). Two sites can share the same renewable power, the same cooling and the same efficiency scores, and only one of them has the town on the revenue line. "Green cannot tell these two apart. Regenerative can. That is the whole difference," Hilborn writes. Regenerative Infrastructure Holdings, the development and holding company she founded with Christopher Gee, is building its first site to the definition: a planned 100 MW regenerative AI data centre and training-centre campus in Nepal, on run-of-river hydro and solar (company figures). It is a joint venture with Mountain Solar Holdings, whose director, Uttam Bhlon Lama, was elected Senior Vice President of the Independent Power Producers' Association, Nepal in June 2026 (Kantipur, Republica). The definition comes with a six-question test for any applicant: is the power renewable, contractual and additional to the grid; what happens to the heat and the water; does the community hold an ownership or governance stake; is ecology measured and improving; is the building designed for the people around it; and is value distributed before profit is taken. RIH applies it to its own project and says the Nepal site does not yet pass the first question: its power is renewable and contractual, but drawn from existing generation rather than new capacity (RIH FAQ). Hilborn came to data centres from twenty years in international development, fifteen of them in Nepal, including the response to the 2015 earthquakes, where she watched outside money arrive, build something and leave. In 2019 she began testing hydro-powered compute in Nepal, at first Bitcoin mining, with the value routed back to the communities around it; since 2022 the work has centred on AI data centres, and she says she coined the term "regenerative AI data center" that year (company account). The founders presented the model on the AI Data Center track of the AI Infra Summit in Santa Clara on 17 September 2026, a conference its organisers put at more than 8,000 attendees. "Making a data center sustainable or green is an engineering problem — and the industry's best minds are already solving it," Gee said there. "What isn't being solved, and what's actually plaguing this industry, is how we make data centers good citizens of the communities they're built in." The reason it matters, in Hilborn's account, is what gets built on top. AI is trained inside the energy, capital and governance of the facility that forms it, and she argues it inherits those conditions. "If artificial intelligence is going to inherit the systems we build beneath it," she said in Santa Clara, "we should be asking what we want those systems to pass forward." Drafted quote (for approval), Katie Hilborn, Founder & Managing Director: "Towns are saying no to two things: what the building takes and who keeps what it earns. Green fixes some of the first. Regenerative is built for both. In Nepal that means cooling that keeps water use near zero, heat that goes to greenhouses instead of the air, and a Trust the valley governs that is paid before profits. We also say where we don't yet pass our own test: the power is renewable, but it isn't new capacity yet." The definition and FAQ are public at regenerativeinfrastructureholdings.com. The full architecture and financial models are shared under NDA with accredited investors and aligned partners. Katie Hilborn is available for interview: katie@regeninfra.ai.

Trend context

The US data-centre backlash, with the 3 November midterms days away. Data Center Watch counted at least 75 projects worth about $130bn blocked or delayed in Q1 2026, the most since it began tracking in 2023, with opposition groups more than doubling from 396 to 833 across 49 states (NBC News, June 2026); Q2 added at least 45 projects worth about $68bn (Bloomberg, September 2026). Nearly 50 broadcast ads feature data centres (Cook Political Report via Forbes, 19 October 2026); Senate Democrats blocked a Republican Ratepayer Protection Act on 19 October (Fox News); Stateline (12 October) says the backlash is set to sway the elections. Among registered voters, 58% oppose a local data centre, 15% support one, and 60% expect their bills to rise (Yale Program on Climate Change Communication, spring 2026). The objections come in two kinds. Physical: a 100 MW data centre can draw as much electricity as 100,000 households (IEA, April 2025); wholesale prices at some grid nodes near data centres were as much as 267% higher in April 2025 than five years earlier (Bloomberg, September 2025); Google consumed 10.9bn gallons of water in 2025, up 34% (Google 2026 Environmental Report); noise above 65 dB raises stress and blood pressure (EESI). And the money: who keeps what the facility earns. The industry's answer, green, works on the first kind and only part of it. Hilborn's definition is built for both, and publishes the one question its own Nepal site does not yet pass. Secondary peg for Asia desks: Nepal is pitching itself as a compute destination (AmCham Nepal's "Hydro-to-Data" proposal in Washington, April 2026, Kantipur) and struggles to export its monsoon surplus.

About Regenerative Infrastructure Holdings

Why we exist

Outside money arrives, builds something and leaves. Katie Hilborn watched that cycle for fifteen years in Nepal; what lasted was whatever a community could run and earn from after the money had gone. AI is the largest infrastructure build in history, and most of it is being formed inside extractive conditions. RIH exists to build the conditions instead: energy that restores, communities that participate, governance that holds.

How we do it

RIH is a development and holding company, not an operator. Each project is a national joint venture: the local partner brings land, permits, power, fibre and construction; an operator runs the facility; RIH designs the regenerative layer and structures the blended capital. Physical layer: renewable, site-aligned power, closed-loop non-evaporative cooling, waste heat reused locally, noise and EMF mitigation. Structural layer: a Community Trust paid from revenue before profits, a Community Investment Pool open to local people at any amount, community consent before ground-breaking, and annual impact reporting built to IFC Performance Standards (company model).

What we do

Regenerative Infrastructure Holdings, LLC, founded by Katie Hilborn (Founder & Managing Director) and Christopher Gee (Co-Founder & Managing Director). It originates, structures and governs AI data centres and AI training centres through joint ventures, under a framework it calls Regenerative Intelligence Infrastructure™. Phase 1 is a planned 100 MW campus in Nepal in joint venture with Mountain Solar Holdings Pvt. Ltd.; the company says it is in discussions on projects in the United States, Canada and several African countries. No site is operating yet. Website: regenerativeinfrastructureholdings.com. Spokesperson: Katie Hilborn, katie@regeninfra.ai.

Why it matters

If RIH vanished at midnight, the gap would be the one Data Center Watch keeps counting: about $198bn of US data-centre projects blocked or delayed in the first half of 2026 (Data Center Watch, via NBC News and Bloomberg) and no developer building the second layer at all. The enemy is the extractive default, the project where revenue leaves the region the day it is earned and the community was consulted once, if at all. The victim is the household beside a facility that hit every efficiency target and still raised its power bill and its blood pressure. The victor is a valley that owns a slice of what its river powers.

Who it's for

The Nepali electrical engineer who graduated into a grid that struggles to sell its monsoon surplus (Kantipur, April 2026) and is holding a job letter for Doha. She wants to stay in the valley her family farms and work on something that is hers. If the campus is built the way RIH describes it, her valley's Trust is paid before any profit is distributed, she can buy into the project at any amount, and the training centre is where she learns to run it. She is who the structure is for. Who it is sold to: compute off-takers who need renewable, contractual power; the development-finance and family-office capital that funds phase one; and the host government and local partner who approve it.

Proof points

100 MW: planned capacity of the Nepal campus (company figures). 20 years in international development, 15 of them in Nepal; three critical-infrastructure projects completed there by Hilborn (company figures; her speaker-bureau profiles say the same). 2019: first hydro-powered compute model in Nepal, built as Bitcoin mining to fund community development; AI data centres since 2022 (company account). 600 MW-plus: combined capacity of the hydropower projects JV partner Uttam Bhlon Lama oversees as a board director of CEDB Hydro Power Development Company (IPPAN profile). RIH puts his wider portfolio exposure at over 800 MW of hydro and 230 MW of solar (company figures). 4: the dimensions each site reports against annually (Natural Intelligence, Distributed Prosperity, Sovereign Futures, Human Coherence), built to IFC Performance Standards (company model). 0 sites operating; 0 revenue. The first project is planned, with its data room open under NDA. Not yet published: the share of revenue the Community Trust receives.

Traction & credibility

AI Infra Summit, Santa Clara, 17 September 2026: Hilborn and Gee gave a fireside, "The Conditions of Creation," on the AI Data Center track (official speaker listing, ai-infra-summit.com); organisers projected more than 8,000 attendees. EarthX 2026, Dallas, 20 to 22 April: Hilborn spoke on the regenerative AI data centre (per RIH); data centres were the conference's headline topic (KERA). Global Family Office Investment Summit, Dubai, 4 to 5 February 2026: Hilborn spoke on two panels and received the Summit's Lifetime Achievement Award (per RIH; the Summit confirms it presents such awards). Agentic Day Miami, 2026: Hilborn moderated the AI Infrastructure & Economics panel (Luma listing). JV partner Uttam Bhlon Lama was elected Senior Vice President of the Independent Power Producers' Association, Nepal, unopposed, in June 2026 (Kantipur, Republica); he is a board director of NMB Bank and founding chairman of NMB Microfinance (IPPAN profile). Advisers, per RIH: James Wolff, partner at Greenspoon Marder LLP; Mario Casiraghi, owner-operator of a 2 MW AI data centre in Sweden through Singularity Compute; Bayasa Rentsendorj, formerly acting deputy director at a US development finance agency. Katie Hilborn: Silver Anthem Award for Nonprofit Leader of the Year, multiple Telly Awards, the President's Volunteer Service Award for Lifetime Achievement (speaker-bureau profiles).

Spokespeople

Katie Hilborn

Founder & Managing Director

Katie Hilborn founded Global Orphan Prevention in 2010 and was running relief missions into Nepal's hill districts after the April 2015 earthquakes when she found a trafficking network taking displaced girls (ASU State Press, August 2015). What she took from the years after was the pattern: money arrived, built, left. Of her twenty years in international development, fifteen centred on Nepal, where she completed three critical-infrastructure projects and built the relationships across development, energy and finance that became RIH's joint venture. She began testing hydro-powered compute for community income in Nepal in 2019, moved to AI data centres in 2022 and published her definition of a regenerative AI data centre on 10 October 2026. In her words: "The conditions of creation shape what is created."

Expertise

Regenerative AI data centres; Community Trust and benefit-sharing governance; Nepal hydropower and infrastructure development; blended and catalytic capital; the green-versus-regenerative argument; aid-to-infrastructure careers; women building AI infrastructure

Notability

Fireside on the AI Data Center track, AI Infra Summit, Santa Clara, 17 September 2026 (official speaker listing); spoke at EarthX 2026, Dallas (per RIH); Lifetime Achievement Award, Global Family Office Investment Summit, Dubai, February 2026 (per RIH); Silver Anthem Award for Nonprofit Leader of the Year, multiple Telly Awards, President's Volunteer Service Award for Lifetime Achievement (speaker-bureau profiles); featured in New York Magazine, NBC Colorado and ABC Chicago (her media page)

Christopher Gee

Co-Founder & Managing Director

Christopher Gee has twenty years across international development, finance and digital infrastructure, including work with the World Bank, UNICEF, UNDP and governments across Asia, Africa and the Pacific (company bio). Before RIH he co-founded and served as COO of Shanzhai City in Hong Kong, building fintech and AI tools for HKEX and the Binance Charity Foundation (company bio). At RIH he designed the capital structure and regulatory strategy and co-architected the Community Trust and benefit-sharing structures that make the model investable across jurisdictions. On stage at the AI Infra Summit in September 2026 he said green "is an engineering problem" the industry's best minds are already solving, and that the unsolved one is how data centres become "good citizens of the communities they're built in."

Expertise

Blended and catalytic capital for infrastructure; public-private partnership design; Community Trust and benefit-sharing structures; cross-jurisdiction regulatory strategy; how a 100 MW campus in a least-developed market gets funded; fintech and impact data

Notability

Fireside on the AI Data Center track, AI Infra Summit, Santa Clara, 17 September 2026 (official speaker listing); co-founder and former COO of Shanzhai City, Hong Kong (company bio); work with the World Bank, UNICEF and UNDP (company bio)


Talking points

The insight

efficiency won't get a data centre past the town hall. a 20-year humanitarian says the missing line in the plan is who gets paid first

www.regenerativeinfrastructureholdings.com/news/what-is-a-regenerative-ai-data-center

The story

On 10 October 2026 Katie Hilborn, Founder & Managing Director of Regenerative Infrastructure Holdings, published a working definition of a regenerative AI data centre: an AI data centre designed as one living system with the ecosystems it lives inside, strengthening their energy, water, ecology, community economies and governance. Towns are refusing two things this year, what the building takes and who keeps what it earns, and green answers only part of the first. The definition has two layers and a facility qualifies only with both: the building (renewable site-aligned power, closed-loop non-evaporative cooling, waste heat reused locally, noise and EMF mitigation) and the system around it (a locally governed Community Trust paid from revenue before profits, a Community Investment Pool, a seat in governance). "Green cannot tell these two apart. Regenerative can. That is the whole difference," Hilborn writes. Her company's first site is a planned 100 MW campus in Nepal, in joint venture with Mountain Solar Holdings, whose director Uttam Bhlon Lama was elected Senior Vice President of Nepal's Independent Power Producers' Association in June 2026 (Kantipur, Republica), and RIH publishes which of its own six questions the site does not yet pass: the first, because the power is renewable and contractual but not yet new capacity (RIH FAQ).

Why it matters

About $198bn of US data-centre projects were blocked or delayed in the first half of 2026: at least 75 projects worth about $130bn in Q1 (Data Center Watch via NBC News, June 2026) and at least 45 worth about $68bn in Q2 (Data Center Watch via Bloomberg, September 2026). Among registered voters, 58% oppose a data centre in their local area and 15% support one; 60% expect their bills to rise if one opens (Yale Program on Climate Change Communication, spring 2026). Nearly 50 midterm broadcast ads feature data centres (Cook Political Report via Forbes, 19 October 2026). The objections are power bills, water, noise and who profits. The industry's answer has been efficiency, which addresses some of the physical objections and none of the money one. Hilborn's argument is that a facility can pass every green test and still be refused, because green was only ever half the answer.

Who does it impact

For planning boards and county commissioners, a six-question test they can put to any applicant: is the power additional to the grid; what happens to the heat and the water; does the community hold an ownership or governance stake; is ecology measured and improving; is the building designed for the people around it; is value distributed before profit is taken. The applicant's own answer sheet is the example: RIH says its Nepal site does not yet pass question one. For host countries with surplus renewables, Nepal first, a template in which part of the compute stays sovereign and the valley can invest in what its river powers. For the household next to a proposed facility, a yardstick for both halves of the objection: what the building takes, and who gets paid, and when. For developers, a definition they will be measured against whether they adopt it or not.

Proof points

The definition and FAQ are published and citable, including the six-question test and RIH's own answer on question one (RIH, 10 October 2026). Hilborn's record: twenty years in development, fifteen in Nepal, three critical-infrastructure projects completed (company figures). The JV partner: Uttam Bhlon Lama, elected Senior Vice President of IPPAN in June 2026 (Kantipur, Republica), board director of NMB Bank (IPPAN). The platform: a fireside on the AI Data Center track of the AI Infra Summit, Santa Clara, 17 September 2026 (official speaker listing). Christopher Gee, on stage there: "Making a data center sustainable or green is an engineering problem — and the industry's best minds are already solving it. What isn't being solved, and what's actually plaguing this industry, is how we make data centers good citizens of the communities they're built in." Hilborn, same stage: "If artificial intelligence is going to inherit the systems we build beneath it, we should be asking what we want those systems to pass forward." Drafted quote (for approval), Katie Hilborn: "Towns are saying no to two things: what the building takes and who keeps what it earns. Green fixes some of the first. Regenerative is built for both. In Nepal that means cooling that keeps water use near zero, heat that goes to greenhouses instead of the air, and a Trust the valley governs that is paid before profits. We also say where we don't yet pass our own test: the power is renewable, but it isn't new capacity yet."

CTA

Katie Hilborn is available for interview on the definition, both layers of the Nepal campus and the Community Trust mechanism: katie@regeninfra.ai. Christopher Gee is available on the capital structure. The definition is at regenerativeinfrastructureholdings.com/news/what-is-a-regenerative-ai-data-center and the FAQ, including the six-question test, at regenerativeinfrastructureholdings.com/faq. The green-versus-regenerative comparison chart is available as a graphic.

Key facts

Definition published
10 October 2026, "What is a Regenerative AI Data Center?", Katie Hilborn, regenerativeinfrastructureholdings.com
Phase 1 site
Planned 100 MW regenerative AI data centre and training-centre campus, Nepal; run-of-river hydro and solar; JV with Mountain Solar Holdings Pvt. Ltd. (company figures). No site operating yet.
Community mechanism
Community Trust, locally governed, paid a share of facility revenue before profits are distributed; Community Investment Pool open to local people at any amount (company model; share not published)
US backlash, H1 2026
About $198bn of projects blocked or delayed: at least 75 worth about $130bn in Q1 (Data Center Watch via NBC News) and at least 45 worth about $68bn in Q2 (Data Center Watch via Bloomberg, Sept 2026)
Voter sentiment
58% of registered voters oppose a local data centre, 15% support; 60% expect bills to rise (Yale Program on Climate Change Communication, spring 2026). Nearly 50 midterm broadcast ads feature data centres (Cook Political Report via Forbes, 19 Oct 2026)
Power and water context
A 100 MW data centre can use as much electricity as 100,000 households (IEA, April 2025). Google consumed 10.9bn gallons of water in 2025, up 34% (Google 2026 Environmental Report). Noise above 65 dB raises stress and blood pressure (EESI)
JV partner
Uttam Bhlon Lama, Director of Mountain Solar Holdings; elected Senior Vice President of IPPAN unopposed, June 2026 (Kantipur, Republica); board director, NMB Bank (IPPAN profile)
Term origin
"Regenerative AI data center" and "Regenerative Intelligence Infrastructure" coined by Hilborn in 2022, when the industry spoke of green or sustainable data centres (company's claim)

Get in touch

Katie Hilborn

Founder & Managing Director

Drop me a note and I'll reply by email.